PLÀNOL DE SABADELLAdreces i telèfons d'emergènciesFARMÀCIES DE GUÀRDIARESTRICCIÓ DE TRÀNSIT

Projectes

Pneumatic waste collection

300.000 euro savings per year avoiding: Collection trucks routes: 38.091 km / year Noise Bad Smell CO2 emissions : 7,8 tn /year

Waste tracing

Medium term objective (2014): Continuos optimisation of waste collection routes, minimising them and hence reducing their economic, environmental and energy costs through the installation of: * Sensors at containers providing information about whether they have been emptied or not. * Control sustem about the position of collectiong trucks in order to monitor their location in real time.

Remote management of irrigation

Irrigation by remote management at 100% of Sabadell green areas.

Traffic active management.

Medium term objective (2014-2015): Implementation of a comprehensive central management and control of city traffic that will: * Coordination of mobility with work and occupational information from public roads. * Information on less congested routes to generate routes for emergency services (ambulance, fire ...) * Increasing the number of surveillance cameras in the most conflicitvos (entrances to the city, Gran Via, Eix Macià. ..) * Activating a smartphone application to inform the citizen real-time traffic conditions.

Public transporation active management

Medium term objective (2014 - 2015): * Extension of OAS system to remaining bus stops.. Medium term objective (2015 - 2015): * Renovation of 3 buses TUS, 1 and 2 diesel hybrid.

Public lighting

* Average yearly savings of 1.040.999 € during the contract period (2012-2022), provided that energy prices increase at an 8% rate per year. * 20% of lamps equipped with LED technology. * 79% of light points equipped with flow regulator. * 30% of energy savings and 847 Tn decrease in CO2 emissions per year, once the investment is executed. * Assignment of a thousand lights in other municipalities to improve energy efficiency. http://bit.ly/1iKd5aM