PLÀNOL DE SABADELLAdreces i telèfons d'emergènciesFARMÀCIES DE GUÀRDIARESTRICCIÓ DE TRÀNSIT

 

CA EN ES
       
Open Data Apps de la ciutat APP Ajuntament

Traffic active management.

Medium term objective (2014-2015): Implementation of a comprehensive central management and control of city traffic that will: * Coordination of mobility with work and occupational information from public roads. * Information on less congested routes to generate routes for emergency services (ambulance, fire ...) * Increasing the number of surveillance cameras in the most conflicitvos (entrances to the city, Gran Via, Eix Macià. ..) * Activating a smartphone application to inform the citizen real-time traffic conditions.

Continue Reading

Public lighting

* Average yearly savings of 1.040.999 € during the contract period (2012-2022), provided that energy prices increase at an 8% rate per year. * 20% of lamps equipped with LED technology. * 79% of light points equipped with flow regulator. * 30% of energy savings and 847 Tn decrease in CO2 emissions per year, once the investment is executed. * Assignment of a thousand lights in other municipalities to improve energy efficiency. http://bit.ly/1iKd5aM

Continue Reading

Public Facilities

Running: Energy saving measures at municipal facilities: * Remote heating of buildings 59 * 39 facilities with installations of solar thermal (1972.89 m2) * 9 facilities with photovoltaic solar energy (with a capacity of 138.9 kWp) * 5 facilities with geothermal energy (with a capacity of 2087.2 kW) * Installing 45 capacitor banks allowing compensate reactive power. * Network analyzers header in 41 facilities to enable continuous monitoring of consumption and electrical parameters * Monitoring two facilities producing solar thermal collectors by ACS (Cal and San Balsach Oleguer) * 1 wind sensor 10kWp Park Central valley.

Continue Reading

Traffic Lights

100% of traffic light opticals equipped with LED technology. This has meant annually: -Reduction in the consumption of 1,165,616 kWh -Decrease of 210,976 kg CO2 -Savings of 138,000 €

Continue Reading

Smart Meters

EXECUTED (2009 - 2014): * Campaign made ??with Smart-meters (meter electricity consumption in real time), transferred to households Sabadell for 6 months. * By the Office of the Covenant of Mayors (Covenant of Mayors) as an example of success in the fight against climate change. * Divided into 5 phases (100 homes in total): * Phase 1 trial (2009-2010): 28 homes in the High Cross and the Cross of Barbera * Phase 2 west area (2010-2011): 22 homes * Phase 3, North Zone (2011-2012): 22 homes * Phase 4 Central-East zone 15 homes in Covadonga, our homes, Torre-Romeu, Central-East, Can Roqueta Amal El Raval, Poble Nou and Sun Padrís * Phase 5, 2013-2014 22 families who have installed the counter in December 2013. * Estimation of reducing greenhouse gas emissions by 3,022 kg / yr of CO2 (12.5% reduction in energy consumption).

Continue Reading